Installation

Pulivendula Cable-Stayed Bridge

The full span mirrors in the water below, and the bridge has become the landmark the district is photographed by.

Pulivendula Cable-Stayed Bridge
Location
Pulivendula, Andhra Pradesh
Year
2024

Challenge

Cable stays are thin, highly reflective and sit over open water — the fixtures had to survive the exposure and still light every cable evenly from the deck.

Solution

IP66 linear RGB fixtures were run along the deck edge and aimed up the stay lines, with the pylon lit separately so the fan of cables reads as one form.

Result

The full span mirrors in the water below, and the bridge has become the landmark the district is photographed by.

Have a project in mind?

Let's create something extraordinary with light.

Discuss Project

WhatsApp us

Quick response from our lighting team.

+91-80478-12802

Download catalogue

The complete product range in one PDF · 27.3 MB.

Download